Japeatr's knocking at the track rebuild thread
#305
ive been sick the last few days, my goal is to get the exhaust mani, turbo, AN hoses made for oil feed/drain, fittings installed for EQP, CKP sensor and front cover installed.
Then would just be waiting on clutch parts before it gets installed.
Then would just be waiting on clutch parts before it gets installed.
#310
Made some progress this week. 90% of my fittings are in, in the process of making AN lines for the drain and oil feed.
I studded the turbo manifold so the bolts wouldn't loosen and mounted the turbo and verified its orientation.
Started working out the fittings for the EWP hoses and routing.
Biggest accomplishment was drilling and tapping the 1/8"npt port for the PCV vent in the head in our OTTP manifolds.
after this next weekend I plan on ordering the clutch and flywheel.
I studded the turbo manifold so the bolts wouldn't loosen and mounted the turbo and verified its orientation.
Started working out the fittings for the EWP hoses and routing.
Biggest accomplishment was drilling and tapping the 1/8"npt port for the PCV vent in the head in our OTTP manifolds.
after this next weekend I plan on ordering the clutch and flywheel.
#317
The following users liked this post:
JapEatr (03-29-2016)