6.0 litre RWD cobalt project
#128
Senior Member
Join Date: 05-05-10
Location: Moline IL
Posts: 942
Likes: 0
Received 0 Likes
on
0 Posts
#129
Senior Member
Thread Starter
iTrader: (-1)
Join Date: 02-26-06
Location: Ontario Canada
Posts: 944
Likes: 0
Received 0 Likes
on
0 Posts
As for when the car will be out, I need some friggen wheels.. They've been on order with sueprbuytires from california since december and I just found out they were screwing me over.. They have my money as well so I might be out 2500 bucks!!!!!!!!! erg.
I have to order a new set this week from wheels for less in Vaughn ontario. Once I have wheels im on the home stretch!!.. The things left I have to do are:
- Install rear main seal and new oil pan gasket (3 beer job)
- Finish all wiring (50% done) (6 beer job)
- Finish Steering (95% done) (1 beer job)
- Finish off securing the air intake (1 beer job)
- Mount the Power steering fluid resevoir (1 beer job)
- Route Brake Lines (4 beer job)
- Route Fuel Lines (4 beer job)
- Build Exhaust (couple beers)
- Build Roll cage (might not do this right away, will just drive slow ) (sunday job at work)
- Find some outer tie rods that screw onto the steering rack but still bolt into cobalt knuckles.(couple beer job for Napa auto parts )
- Finish rear end mounting of air struts (4 beer job)
- Install Air ride and Battery (6 beer job)
- Install Interior (not required to do burnouts )
- Weld in new Nut`s for rear seat mounting (1/2 beer job)
- Get alignment
- Get E-test (not looking forward to this)
#130
Senior Member
iTrader: (6)
Id love to get a letter from Chevy on this.. Id be even happier if I got a job with them haha.
As for when the car will be out, I need some friggen wheels.. They've been on order with sueprbuytires from california since december and I just found out they were screwing me over.. They have my money as well so I might be out 2500 bucks!!!!!!!!! erg.
I have to order a new set this week from wheels for less in Vaughn ontario. Once I have wheels im on the home stretch!!.. The things left I have to do are:
- Install rear main seal and new oil pan gasket (3 beer job)
- Finish all wiring (50% done) (6 beer job)
- Finish Steering (95% done) (1 beer job)
- Finish off securing the air intake (1 beer job)
- Mount the Power steering fluid resevoir (1 beer job)
- Route Brake Lines (4 beer job)
- Route Fuel Lines (4 beer job)
- Build Exhaust (couple beers)
- Build Roll cage (might not do this right away, will just drive slow ) (sunday job at work)
- Find some outer tie rods that screw onto the steering rack but still bolt into cobalt knuckles.(couple beer job for Napa auto parts )
- Finish rear end mounting of air struts (4 beer job)
- Install Air ride and Battery (6 beer job)
- Install Interior (not required to do burnouts )
- Weld in new Nut`s for rear seat mounting (1/2 beer job)
- Get alignment
- Get E-test (not looking forward to this)
As for when the car will be out, I need some friggen wheels.. They've been on order with sueprbuytires from california since december and I just found out they were screwing me over.. They have my money as well so I might be out 2500 bucks!!!!!!!!! erg.
I have to order a new set this week from wheels for less in Vaughn ontario. Once I have wheels im on the home stretch!!.. The things left I have to do are:
- Install rear main seal and new oil pan gasket (3 beer job)
- Finish all wiring (50% done) (6 beer job)
- Finish Steering (95% done) (1 beer job)
- Finish off securing the air intake (1 beer job)
- Mount the Power steering fluid resevoir (1 beer job)
- Route Brake Lines (4 beer job)
- Route Fuel Lines (4 beer job)
- Build Exhaust (couple beers)
- Build Roll cage (might not do this right away, will just drive slow ) (sunday job at work)
- Find some outer tie rods that screw onto the steering rack but still bolt into cobalt knuckles.(couple beer job for Napa auto parts )
- Finish rear end mounting of air struts (4 beer job)
- Install Air ride and Battery (6 beer job)
- Install Interior (not required to do burnouts )
- Weld in new Nut`s for rear seat mounting (1/2 beer job)
- Get alignment
- Get E-test (not looking forward to this)
Also I'd lawyer up and have them send that company a letter 2500 is a pretty good sum if they're just stealing it from people expecting rims/tires
#131
Senior Member
Thread Starter
iTrader: (-1)
Join Date: 02-26-06
Location: Ontario Canada
Posts: 944
Likes: 0
Received 0 Likes
on
0 Posts
Yea I already threatened with that, so hopefully they sent it friday... This is the worst company I've ever had to deal with, no clue how they've been in business for 20+ years.
#132
Senior Member
iTrader: (3)
Id love to get a letter from Chevy on this.. Id be even happier if I got a job with them haha.
As for when the car will be out, I need some friggen wheels.. They've been on order with sueprbuytires from california since december and I just found out they were screwing me over.. They have my money as well so I might be out 2500 bucks!!!!!!!!! erg.
I have to order a new set this week from wheels for less in Vaughn ontario. Once I have wheels im on the home stretch!!.. The things left I have to do are:
- Install rear main seal and new oil pan gasket (3 beer job)
- Finish all wiring (50% done) (6 beer job)
- Finish Steering (95% done) (1 beer job)
- Finish off securing the air intake (1 beer job)
- Mount the Power steering fluid resevoir (1 beer job)
- Route Brake Lines (4 beer job)
- Route Fuel Lines (4 beer job)
- Build Exhaust (couple beers)
- Build Roll cage (might not do this right away, will just drive slow ) (sunday job at work)
- Find some outer tie rods that screw onto the steering rack but still bolt into cobalt knuckles.(couple beer job for Napa auto parts )
- Finish rear end mounting of air struts (4 beer job)
- Install Air ride and Battery (6 beer job)
- Install Interior (not required to do burnouts )
- Weld in new Nut`s for rear seat mounting (1/2 beer job)
- Get alignment
- Get E-test (not looking forward to this)
As for when the car will be out, I need some friggen wheels.. They've been on order with sueprbuytires from california since december and I just found out they were screwing me over.. They have my money as well so I might be out 2500 bucks!!!!!!!!! erg.
I have to order a new set this week from wheels for less in Vaughn ontario. Once I have wheels im on the home stretch!!.. The things left I have to do are:
- Install rear main seal and new oil pan gasket (3 beer job)
- Finish all wiring (50% done) (6 beer job)
- Finish Steering (95% done) (1 beer job)
- Finish off securing the air intake (1 beer job)
- Mount the Power steering fluid resevoir (1 beer job)
- Route Brake Lines (4 beer job)
- Route Fuel Lines (4 beer job)
- Build Exhaust (couple beers)
- Build Roll cage (might not do this right away, will just drive slow ) (sunday job at work)
- Find some outer tie rods that screw onto the steering rack but still bolt into cobalt knuckles.(couple beer job for Napa auto parts )
- Finish rear end mounting of air struts (4 beer job)
- Install Air ride and Battery (6 beer job)
- Install Interior (not required to do burnouts )
- Weld in new Nut`s for rear seat mounting (1/2 beer job)
- Get alignment
- Get E-test (not looking forward to this)