General Cobalt General Cobalt, Pursuit, and Ion talk. Post specific discussions in the forums below

SS/SC On Hold Week of 04/25/2005

Old Apr 27, 2005 | 09:26 AM
  #26  
bcghr's Avatar
New Member
 
Joined: 01-11-05
Posts: 31
Likes: 0
From: Orlando
Hi. I've been waiting since Dec. 14th. Was told 2 weeks ago my build date was May 2nd. Not sure how this latest HOLD will affect that date.
Reply
Old Apr 27, 2005 | 07:12 PM
  #27  
aka_Matt's Avatar
New Member
 
Joined: 09-01-04
Posts: 197
Likes: 0
From: Bloomingburg, NY
mine was built on 4/6... on hold, they won't release it for some unknown reason... my salesman called today, they told him they couldn't tell him the reason... that gets me... if ur gonna hold my car, at least tell me WHY!! i hate secrets... damn GM...
Reply
Old Apr 27, 2005 | 07:20 PM
  #28  
Firenze's Avatar
Member
 
Joined: 01-29-05
Posts: 203
Likes: 0
From: Mississauga, Canada
Originally Posted by aka_Matt
mine was built on 4/6... on hold, they won't release it for some unknown reason... my salesman called today, they told him they couldn't tell him the reason... that gets me... if ur gonna hold my car, at least tell me WHY!! i hate secrets... damn GM...
Most likely, it's the sunroof that you ordered that's the reason for the hold. It might possibly be the silver paint as that's technically not available for the SS/SC.
Reply
Old Apr 27, 2005 | 07:28 PM
  #29  
NightRydinSS's Avatar
New Member
 
Joined: 01-06-05
Posts: 58
Likes: 0
From: Edmonton, Alberta, Canada
I agree, GOTTA bethe sunroof. the good news is there isn't much left to build onto the car after, so, how many more delays can there be?? (waiting on Black SS S/C blue inserts,sunroof)
Reply
Old Apr 27, 2005 | 08:14 PM
  #30  
PygmySurfer's Avatar
New Member
 
Joined: 02-09-05
Posts: 92
Likes: 0
From: Earth
Originally Posted by aka_Matt
mine was built on 4/6... on hold, they won't release it for some unknown reason... my salesman called today, they told him they couldn't tell him the reason... that gets me... if ur gonna hold my car, at least tell me WHY!! i hate secrets... damn GM...
Mine was built the week of 3/21 and its on hold, too. Dealer called me yesterday and said it was for some kind of inspection, but I wonder if it could be the Sunroof issue. I called GM Canada today, and they're going to try and find some answers for me too. Really sucks knowing its built and just sitting there
Reply
Old Apr 29, 2005 | 09:12 AM
  #31  
PygmySurfer's Avatar
New Member
 
Joined: 02-09-05
Posts: 92
Likes: 0
From: Earth
Delays over soon?

OK, so I just got a call from GM. I was informed that there have been a bunch of SS/SC models that're already built that've been sitting at the plant since March 30th. Apparently, there was a small issue with Sunroofs that they'd been fixing. However, they were only fixing them on the weekends. They're HOPEFULLY going to be finished fixing them this weekend, at which point they'll start rolling out to dealers (Hopefully they've been rolling them out after fixing them this whole time, but that wasn't the impression I got). She then said it'd be up to 10 days for the trek from Lordstown to Windsor (which I thought was interesting - it's a 3 hour drive) and it could be 5 days from the time it arrives in Windsor until it reaches the dealer. So, it looks like I can expect to see something in about 20 days. Hopefully everyone else will also. For now, I guess I'll just remain cautiously optimistic
Reply
Old Apr 29, 2005 | 10:26 AM
  #32  
Chevy4Life85's Avatar
Senior Member
 
Joined: 04-02-05
Posts: 976
Likes: 0
From: Connecticut
Originally Posted by aka_Matt
mine was built on 4/6... on hold, they won't release it for some unknown reason... my salesman called today, they told him they couldn't tell him the reason... that gets me... if ur gonna hold my car, at least tell me WHY!! i hate secrets... damn GM...
They have to add the special sauce... duh

If your car is built and they are holding it... just eb happy that means they are fixing problems that they knew already came up... so you wont have to deal with them.
Reply
Old Apr 29, 2005 | 11:38 AM
  #33  
ToxicPoison's Avatar
New Member
 
Joined: 02-15-05
Posts: 170
Likes: 0
From: Washington DC
Originally Posted by PygmySurfer
Mine was built the week of 3/21 and its on hold, too. Dealer called me yesterday and said it was for some kind of inspection, but I wonder if it could be the Sunroof issue. I called GM Canada today, and they're going to try and find some answers for me too. Really sucks knowing its built and just sitting there
Ditto.
My car has been built for 2.5 weeks (Confirmed by my dealer and folks on this board). I even have a VIN #. Its been sitting in "quality control" the whole time.
I'm REALLY hoping it'll show up next week.
Reply
Old Apr 30, 2005 | 07:15 PM
  #34  
chevytech329's Avatar
New Member
 
Joined: 03-15-05
Posts: 177
Likes: 0
From: tennessee - bartlett
Yea mine is also built but in "hold" for some reason since 4/13. Dont know what the hold up is. I have a vin #, order number and everything. Still have not got a price (i get a discount because im an employee).

So..
Playing the waiting game!!!

Jeff
Reply
Old May 2, 2005 | 08:54 AM
  #35  
mken's Avatar
Premium Member
 
Joined: 02-23-05
Posts: 863
Likes: 0
From: Florida
I already have my SS/SC, it was built in Feb. Is this a recently discovered flaw with the sunroofs on ALL Cobalts built, or just a manufacturing problem that arrose at a later time? Should I expect my sunroof to give me problems down the road?
Reply
Old May 2, 2005 | 02:22 PM
  #36  
PygmySurfer's Avatar
New Member
 
Joined: 02-09-05
Posts: 92
Likes: 0
From: Earth
Originally Posted by mken
I already have my SS/SC, it was built in Feb. Is this a recently discovered flaw with the sunroofs on ALL Cobalts built, or just a manufacturing problem that arrose at a later time? Should I expect my sunroof to give me problems down the road?
My understanding of it is that it was just a manufacturing problem. Not even every car they've held to check out is affected (something like 1 in 5 are). I wouldn't worry about it.
Reply
Old May 2, 2005 | 03:06 PM
  #37  
Calgden's Avatar
New Member
 
Joined: 01-27-05
Posts: 70
Likes: 0
From: Calgary, Alberta
Originally Posted by mken
I already have my SS/SC, it was built in Feb. Is this a recently discovered flaw with the sunroofs on ALL Cobalts built, or just a manufacturing problem that arrose at a later time? Should I expect my sunroof to give me problems down the road?
I'm guessing that you will find out after the first good rain . I found this on another site from a poster named Cobaltbuilder. I would be ticked if I was one of you waiting while the problem was being "repaired"


"O.K. Here is what I found out. There was a rubber gasket on the inside part of the sun roof that was not fittting tightly enough and was letting water leak in, so they stopped shipment until the supplier brought in new gaskets and the old ones were replaced. The trouble is that to replace the gasket you have to remove the whole sun roof assembly and that takes time, tonight I stayed over for a couple of hours and saw at least 70 to 80 cars still waiting to be repaired, however, all the new cars being built have the new gasket... "
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Sl0wbaltSS
2.0L LNF Performance Tech
18
Nov 21, 2018 11:11 PM
RaginChopsuey
War Stories
16
Oct 27, 2015 01:27 PM
brandon04
Problems/Service/Maintenance
46
Oct 21, 2015 07:04 AM
Iceberg
Drivetrain
1
Sep 28, 2015 01:31 PM


Thread Tools
Search this Thread

All times are GMT -4. The time now is 08:28 AM.