so they are all going to come polished like that! SICK. i cant wait for mine! OMG. and i sure hope they are done b4 the end of the month because my car wont be done w out it. its a necessity... errrrr i need it. im so close to being done
Reply
Old May 7, 2008 | 10:06 PM
  #327  
SS/SC Crazer's Avatar
Junior Member
 
Joined: 06-27-07
Posts: 475
Likes: 0
From: Follow the dust trail!
Originally Posted by StevesBlack06
so they are all going to come polished like that! SICK. i cant wait for mine! OMG. and i sure hope they are done b4 the end of the month because my car wont be done w out it. its a necessity... errrrr i need it. im so close to being done
Done? There is always something else to do! what chya doin to it?
Reply
Old May 7, 2008 | 11:24 PM
  #328  
StevesBlack06's Avatar
Senior Member
iTrader: (7)
 
Joined: 01-28-07
Posts: 1,996
Likes: 1
From: Northwest Indiana
its kinda a secret till its all done... lets just say i might put $ on my coby bein the fastest 2.0 in indiana on the m62... we shall just see when its all said and done. hopefully by the end of the month. but i need my vortex! AHH, im done till next winter. hopefully gonna go w/ a TVS.
Reply
Old May 9, 2008 | 09:30 PM
  #329  
lnf08ecotec's Avatar
Senior Member
 
Joined: 11-30-06
Posts: 986
Likes: 0
From: NC
i wonder if those welders finished with the last 12 yet? hmm....shipping yet?
Reply
Old May 11, 2008 | 01:55 PM
  #330  
StevesBlack06's Avatar
Senior Member
iTrader: (7)
 
Joined: 01-28-07
Posts: 1,996
Likes: 1
From: Northwest Indiana
Originally Posted by lsj06ecotec
i wonder if those welders finished with the last 12 yet? hmm....shipping yet?
no doubt... im gettin antsy
Reply
Old May 11, 2008 | 03:20 PM
  #331  
Deathscythe's Avatar
Senior Member
 
Joined: 07-28-06
Posts: 4,994
Likes: 0
From: Waldorf, MD
we need our headers to be sent out. But they do look really good with the end finish.
Reply
Old May 11, 2008 | 09:32 PM
  #332  
DizNutz976's Avatar
New Member
 
Joined: 02-04-08
Posts: 90
Likes: 0
From: Ft. Bragg
damn iv been waiting since the first of last month for this header i sure hope is ships soon
Reply
Old May 11, 2008 | 10:03 PM
  #333  
racehtecobalt's Avatar
Senior Member
 
Joined: 08-03-07
Posts: 653
Likes: 0
From: SANDIEGO.........
i ve been waiting about 2months........im wans it already.....
Reply
Old May 12, 2008 | 08:51 AM
  #334  
JBP's Avatar
JBP
Thread Starter
Banned
 
Joined: 07-04-06
Posts: 606
Likes: 0
From: Toronto
Hey guys, please be patient. I'm sending someone to check on the welders today. If all is good, we move on to electropolishing. Won't be long now..
Reply
Old May 12, 2008 | 09:15 AM
  #335  
Deathscythe's Avatar
Senior Member
 
Joined: 07-28-06
Posts: 4,994
Likes: 0
From: Waldorf, MD
But how long do you think? Will we see these at the end of the month? Or early June maybe.
Reply
Old May 12, 2008 | 09:23 AM
  #336  
Omega_5's Avatar
Senior Member
 
Joined: 10-01-06
Posts: 5,134
Likes: 0
From: Maidstone, SK
It baffles me how many people have no concept of lead time....
Reply
Old May 12, 2008 | 11:35 AM
  #337  
victory_red_SS's Avatar
LSX RWD S/C conversion
iTrader: (2)
 
Joined: 03-25-05
Posts: 10,450
Likes: 277
From: Maple Ridge, BC, Canada
Originally Posted by Omega_5
It baffles me how many people have no concept of lead time....
Exactly.
Reply
Old May 12, 2008 | 01:14 PM
  #338  
Deathscythe's Avatar
Senior Member
 
Joined: 07-28-06
Posts: 4,994
Likes: 0
From: Waldorf, MD
Ok, I am going to be the one to step out here... since I have no concept of lead time, be a dear and please explain it to me. I am hoping it has nothing to do with patience, because if that's the case then I think you are mistaken. Blanket statements don't fix anything.
Reply
Old May 12, 2008 | 01:29 PM
  #339  
Omega_5's Avatar
Senior Member
 
Joined: 10-01-06
Posts: 5,134
Likes: 0
From: Maidstone, SK
Lead time - "is the time it takes to actually manufacture the order without any inventory other than raw materials or supply parts" and "includes the time required to ship the product to the purchaser".

When running a lean or batch manufacturing environment, lead time is a very critical factor. Small businesses generally run off this concept, as they have very little storage space to house a large amount of inventory, and can offer better deals to the customer with higher volume orders.

So it's a toss up, wait out the lead time, OR pay the increased rate due to either storage costs / inventory or small volume production.
Reply
Old May 12, 2008 | 02:02 PM
  #340  
Deathscythe's Avatar
Senior Member
 
Joined: 07-28-06
Posts: 4,994
Likes: 0
From: Waldorf, MD
So from what you are saying, your last statement is kind of unfair. If we were going by the original lead time, that would been back at the end of last month. I have been on this, watching and reading the updates patiently for a few months now. I understand the concept, but it is hard for me to have my arms flailing in the wind waiting for something to be released. I don't have the luxury to be able to go home after work everyday, and I have to know when something is coming so I can make arrangements for it to be picked up or signed for if necessary.
Reply
Old May 12, 2008 | 02:52 PM
  #341  
Omega_5's Avatar
Senior Member
 
Joined: 10-01-06
Posts: 5,134
Likes: 0
From: Maidstone, SK
Well... unfair or not, that's manufacturing.
My entire career is not only about the design stages of manufacturing, but trying to cut down on costs, fast production and assembly methods, and of course lean manufacturing (involving lead times).
It's sad that things do get pushed back, but there is little that you can do about it... your stuck with what your outsourced company can do for you... in JBP's case, the out sourced welders.

It does become difficult for the customer in some cases... however think of this situation; Last year on a hydrogen fill station project, I was held up becasue our high pressure tank supplier was running 8 weeks late on their production run due to a failed machine, thus pushing back my time to build the rack and place it on site. By the time everything showed up, it was already snowing outside, and our site construction had to be delayed until spring, past our delivery date. One of our major stakeholders pulled out due to us blowing the deadline.... we lost $300k of funding.
Who was to blame for a blown lead time? Us? The tank supplier? The maker of the machine?
I hope people remember this story when getting a delayed part.... no matter how big of a rush your in, it's not like loosing a 1/4 million.
Reply
Old May 12, 2008 | 03:47 PM
  #342  
BooSSted's Avatar
Senior Member
iTrader: (3)
 
Joined: 11-07-05
Posts: 3,247
Likes: 0
From: Bantario
I'm on the list of waiters now too!!!! Cant wait!
Reply
Old May 12, 2008 | 06:06 PM
  #343  
Deathscythe's Avatar
Senior Member
 
Joined: 07-28-06
Posts: 4,994
Likes: 0
From: Waldorf, MD
Omega, I understand the process now. But if no one explains, then no one else knows. I am still learning a lot and I only know the military philosophy. If we can't produce right away, regardless of the reason, then we are broke or retarded and we get replaced right away. Different worlds if you know what I mean.
Reply
Old May 13, 2008 | 05:21 PM
  #344  
JBP's Avatar
JBP
Thread Starter
Banned
 
Joined: 07-04-06
Posts: 606
Likes: 0
From: Toronto
Update: All headers are done! We are picking up the units tomorrow and sending them out to be polished. Won't be long now.
Reply
Old May 13, 2008 | 07:50 PM
  #345  
StevesBlack06's Avatar
Senior Member
iTrader: (7)
 
Joined: 01-28-07
Posts: 1,996
Likes: 1
From: Northwest Indiana
YES!!!!!!! oh my goodness!!!!!!!
Reply
Old May 13, 2008 | 11:15 PM
  #346  
donjuaniii's Avatar
Senior Member
 
Joined: 05-17-06
Posts: 520
Likes: 0
From: Missouri
Yes !!!

It's gonna be a shipping race between getting this header and getting an already ordered intake through another recent GB.

And this is a much more sophisticated manufatured piece - I think!



(Brand not to be mentioned - but you know...)
Reply
Old May 14, 2008 | 01:43 AM
  #347  
Pickles's Avatar
Senior Member
iTrader: (1)
 
Joined: 08-08-07
Posts: 1,641
Likes: 0
From: Calgary, Alberta
Originally Posted by donjuaniii
Yes !!!

It's gonna be a shipping race between getting this header and getting an already ordered intake through another recent GB.

And this is a much more sophisticated manufatured piece - I think!



(Brand not to be mentioned - but you know...)
You think.
Reply
Old May 14, 2008 | 08:49 AM
  #348  
JBP's Avatar
JBP
Thread Starter
Banned
 
Joined: 07-04-06
Posts: 606
Likes: 0
From: Toronto
ok guys, we test fit one unit, looks good. the lower primaries come mighty close to the water pipe but clears... the quality is excellent, welds are solid, the collector is beautifuly duplicated and consistency is there..

we'll try another unit!
Reply
Old May 14, 2008 | 08:05 PM
  #349  
BooSSted's Avatar
Senior Member
iTrader: (3)
 
Joined: 11-07-05
Posts: 3,247
Likes: 0
From: Bantario
Sounds good! Lets hope they all clear the water pipe!!
Reply
Old May 16, 2008 | 02:30 PM
  #350  
lnf08ecotec's Avatar
Senior Member
 
Joined: 11-30-06
Posts: 986
Likes: 0
From: NC
Originally Posted by BooSSted
Sounds good! Lets hope they all clear the water pipe!!
x2...wonder how long it's going to take for the 200 to get electropolished so they can get these shipped out to us
Reply



All times are GMT -4. The time now is 07:11 PM.