CIA Catted downpipe GB Feeler
these are the ones i bought
http://cgi.ebay.com/ebaymotors/ws/eB...7168&viewitem=
i measured the calipers before i ordered but dont remember the dimensions now. i believe theres 8" of long surface and i dont think you wanna go over .8" of width but i could be wrong..
i dont know if that above link will work. it seems like the ones i bought arent up anymore. i might go with these if i was you.
http://cgi.ebay.com/ebaymotors/Bremb...5%7C240%3A1318
http://cgi.ebay.com/ebaymotors/ws/eB...7168&viewitem=
i measured the calipers before i ordered but dont remember the dimensions now. i believe theres 8" of long surface and i dont think you wanna go over .8" of width but i could be wrong..
i dont know if that above link will work. it seems like the ones i bought arent up anymore. i might go with these if i was you.
http://cgi.ebay.com/ebaymotors/Bremb...5%7C240%3A1318
yea i went smaller caz i couldnt find any that were the same size and everyone i contacted said that if they made them to the dimensions i wanted it might make the brembo symbol not look round like it should. i thought i would be disappointed with smaller logos but im really not now. they're not much smaller really.
Boys we offered this sale b/c u wanted the dp. But we made it very clear we did not have these on the shelf and the aluminized dp sale was first priority and that you guys were going to have to wait.
There is no estimated ship date yet and there won't be for another couple weeks. It's either the cheap price or fast turn around. We don't do both.
There is no estimated ship date yet and there won't be for another couple weeks. It's either the cheap price or fast turn around. We don't do both.
Boys we offered this sale b/c u wanted the dp. But we made it very clear we did not have these on the shelf and the aluminized dp sale was first priority and that you guys were going to have to wait.
There is no estimated ship date yet and there won't be for another couple weeks. It's either the cheap price or fast turn around. We don't do both.
There is no estimated ship date yet and there won't be for another couple weeks. It's either the cheap price or fast turn around. We don't do both.
Anyways, thanks to everyone who called their orders in. We ended up with 19 stainless DP's.
Converters shipped out to us today so they will be here next Friday. Flex couplers are being ordered Monday and stainless flanges should be ready in 2 weeks.
As most of you were told on the phone, we are looking at 3 to 4 weeks to get all of them built and shipped.
What a great success this was considering it never even made it to the vendors area. WOW!

Last edited by Stamina; Jun 22, 2009 at 03:31 PM. Reason: Automerged Doublepost
She means it hasnt been 3-4 weeks yet. Don't worry I believe they will definately be shipped by week 4 since the group buy closed and we will hopefully have them at our door by the following week! Can't Wait!
yea i was told that it would be about 4 weeks at the most on the phone so id expect to the house about a week after that. im in no real hurry anyway since i still gotta get my car inspected this month before i put that on. kinda worried about taking it for inspection lol i hate when other ppl mess with my car, i dont trust them haha
What I meant was that Dan has an ESTIMATED ship date. However, a lot depends on factors that are out of our control; shop problems, issues w/ bending, suppliers being behind etc. So we will do our best.
HOWEVER when we started this sale, we made it very clear that we did not have these on our shelf nor parts in stock and you were going to have to wait. We held this strictly b/c you wanted it. We also had a few other sales going first and this was the last one to close. We are working on them and have the materials we need in stock but we ask that you be patient and we will post updates when we have news.
HOWEVER when we started this sale, we made it very clear that we did not have these on our shelf nor parts in stock and you were going to have to wait. We held this strictly b/c you wanted it. We also had a few other sales going first and this was the last one to close. We are working on them and have the materials we need in stock but we ask that you be patient and we will post updates when we have news.
I have the HKS SSQV BOV setup with the Dejon CP, and it sounds awesome! The biggest PITA was getting the BOV mounted on the flange...and most likely you are going to scratch the hell out of it installing it. But you can touch it up with some paint if you don't wanna see all the scuffs on it. I don't know how your installing the BOV, but you should def. consider the HAHN delete plate, and if you do make sure that you reinstall the gray seal and factory BPV spring with the delete plate.
Thread Starter
Senior Member
iTrader: (1)
Joined: 11-29-06
Posts: 4,105
Likes: 0
From: New Minas, Nova Scotia, Canada
it has been 3 weeks since the deal closed....Hopefully it will only be to more weeks...Not rushing you, just excited lol......the count down is on.
Hows everything coming beth
Hows everything coming beth
Up-date
I have all stainless tubing bent.
All converters are in.
All flex couplers are in.
Just waiting for stainless flanges. They should be ready by Wednesday.
So, we are further behind than expected but once the flanges hit out fllor Todd estimates he can have all 20 welded up by the end of three full days. We will do them in batches of most likely 5. This will allow me to ship them as he is assembling/welding them.
Short Ram intake was built, installed and is being tested this weekend.
New thread coming soon in the vendors section.
Thanks again everyone.
All converters are in.
All flex couplers are in.
Just waiting for stainless flanges. They should be ready by Wednesday.
So, we are further behind than expected but once the flanges hit out fllor Todd estimates he can have all 20 welded up by the end of three full days. We will do them in batches of most likely 5. This will allow me to ship them as he is assembling/welding them.
Short Ram intake was built, installed and is being tested this weekend.

New thread coming soon in the vendors section.

Thanks again everyone.


