OFFICIAL Blown 4-banger build updates!
on a real note, i seen a diagram or eploded view of the f35 somewhere on the redlineforums one upon a time, don't ask me to find it though it was a long time ago.
ok found this it might be helpful, it was not what i was looking for, i went to the redlineforums but couldn't find it, they have like 10billion tranny threads!
http://www.eatoninside.com/showthrea...&highlight=f35
http://www.eatoninside.com/showthrea...&highlight=f35
just wondereing if you were considering using a meth kit on your car? from what i've heard it bumps up the octane on the gas, say you but 91 in with that and the meth its 100 octane. and it cools the motor alot.
I have a **** load of cooling mods on my car, and I'll only be running a 2.9" pulley, and with the amount of air my motor will be moving, I'll only make 12-13 psi boost. With the amount of cooling mods I have and that low amount of boost, my IAT2 should be lower than most stock SS/SC.
Oh, heres some eye candy. Yesterday we started on the head porting. We got the +1 mm full radius valve job done, and started porting the ports. EXCITING STUFF!!!
Oh, heres some eye candy. Yesterday we started on the head porting. We got the +1 mm full radius valve job done, and started porting the ports. EXCITING STUFF!!!
Last edited by Blown 4-banger; Jun 25, 2008 at 01:30 PM. Reason: Automerged Doublepost
your slow.
my engine parts have been worked, treated, flowed, tested and back together.
3 weeks and 6 days later its together and idling rite along.
finding a cryo shop to work on my time schedule was a bit hard, but by the time one was located the head work had just been completed.
my engine parts have been worked, treated, flowed, tested and back together.
3 weeks and 6 days later its together and idling rite along.
finding a cryo shop to work on my time schedule was a bit hard, but by the time one was located the head work had just been completed.
your slow.
my engine parts have been worked, treated, flowed, tested and back together.
3 weeks and 6 days later its together and idling rite along.
finding a cryo shop to work on my time schedule was a bit hard, but by the time one was located the head work had just been completed.
my engine parts have been worked, treated, flowed, tested and back together.
3 weeks and 6 days later its together and idling rite along.
finding a cryo shop to work on my time schedule was a bit hard, but by the time one was located the head work had just been completed.
Last edited by Blown 4-banger; Jun 25, 2008 at 04:10 PM. Reason: Automerged Doublepost
on my head we shrouded the valves area just the smallest bit, made myself that much more "OK" with remaining combustion chamber area.
Got woken up on Saturday by the machinist calling to tell me he needed the exhaust mani gasket. I ordered a new gasket today and bought my new crank pulley bolt. Hopefully the head will be mostly done THIS weekend. I'm super excited!
Sweet video you put together man, Are u gonna do a how to guide on your build?
I bet,I can't wait to see it in action. Now that how to you did on the ported blower,Is it ok to that or do you just have the special tools yourself? Cause I wanna use a dremmel,but not go as wide like you did on yours.



